Backlog
Known gaps, loosely ranked. Everything here is a thing this program should be able to say and currently cannot.
Written down rather than left implicit, because "we didn't check
that" and "we checked and it was fine" look identical in a report that
simply has no entry. This table is generated. Edit an
item under backlog/, then run
tools/split-doc.sh --index obscene BACKLOG 2 backlog.
| meaning | |
|---|---|
| 🟢 | done |
| 🟡 | begun |
| 🔴 | open, or explicitly not done |
| ⚪ | deferred, not planned, or carrying no marker either way |